The on-site capture checklist for a Home Energy Rating

    What to prepare, what to record outside, room by room and in the roof space, and the evidence an audit looks for. A practical checklist for Home Energy Rating site visits, checked against the NatHERS Technical Note.

    A living room with a raked timber ceiling, overlaid with LiDAR scan outlines and measurements on the fireplace, cabinets and window.

    A Home Energy Rating can only be as accurate as the site visit behind it. The rating software never sees the house, only what you recorded, so a missed window or a guessed insulation value flows straight into the Star Rating and the household's upgrade advice. Anything missed on site also means a follow-up call, a conservative default or a second trip. This checklist follows the order of a typical assessment, from preparing before the visit to the final checks before you submit.

    The nine stages of a Home Energy Rating site visit in order, from preparing before the visit to the final checks before you submit.

    Before the visit

    • Confirm the address and the dwelling. Check the building class and property type: a freestanding house, a townhouse or an apartment. For an apartment, confirm which level it is on, because that changes the settings for floor height and exposure.
    • Check the climate zone. Use the principal NatHERS climate zone for the postcode. You can use another zone allocated to that postcode only with a justification in the Additional Information field.
    • Establish the year of construction approval. Default insulation values are set by building class, state, NCC climate zone, element and the year of construction approval, not the year built. If you only know the build year, take approval as one year earlier. Newer homes need documentary evidence of the approval year.
    • Research and obtain what you can in advance. Floor area, plans and previous certificates save time on site. Old plans count as evidence only with recent evidence that backs them up.
    • Explain the visit to the household. Tell the household what the visit involves and confirm who will attend.
    • Ask the household for paperwork. Anything the client tells you must be supported by third-party documents: invoices or specifications for insulation, glazing, solar, batteries or a new hot water system.

    On arrival

    • Identify yourself. Accredited data collectors must carry their ID card and present it to the household.
    • Signed consent before you start: get the consent form signed before the assessment begins. If occupants are present, consent must come from someone aged 15 or over. Declare any conflict of interest.
    • Check the site is safe. Complete your health and safety risk assessment.

    Outside

    • Orientation from true north: use true north, not magnetic north. A compass, GPS or a map app are all acceptable.
    • Photos of every external wall type, showing its cladding or construction and its colour, plus the roof colour.
    • Permanent shading only: record eaves, verandahs, pergolas and neighbouring buildings. Never model trees or other vegetation, including protected trees.
    • Exposure: choose the exposure category that best fits the terrain around the home. For apartments it can differ from unit to unit.

    Floor plan and zones

    • Get into every room, plus the roof space and subfloor through their hatches where it is safe. If a room can't be accessed, record why in the Additional Information field.
    • A zone type for every room, and a floor plan that shows dimensions, every window and door, and each room's name. Every home needs one main kitchen/living zone and at least three zones, not counting the garage.
    • Record shared walls, floors and ceilings against their neighbours, such as an adjoining dwelling, a garage or a common corridor.

    Room by room

    • Walls: construction and colour. Wall insulation can only be claimed with documentary evidence. Seeing it isn't enough, and without documents the default applies.
    • Windows and glazed doors: size, head height and offset; frame, glazing type and glazing description; whether each one opens; and internal and external coverings. Low-e glazing, argon-filled double glazing and thermally broken frames need documentary evidence. Orientation comes from the wall each window sits in.
    • Skylights and roof windows.
    • Floor: construction and what is below it, such as a slab on ground, an enclosed or open subfloor, a garage or another dwelling. Record the floor coverings, with photos of the two main ones.
    • Ceiling: insulation, checked from the hatch while you stay on the ladder; the category of gaps in it, which defaults to moderate if you can't see it; and penetrations such as downlights.
    • Ceiling fans and lights: the number and size of ceiling fans, with a photo of each, and the number of halogen lights.
    • Air leakage, in each room: downlights, exhaust fans and whether they are sealed, door and window weatherstripping, chimneys and dampers, vents, and gaps at floorboards and skirtings. A blower door test result can be used instead.

    Roof space and subfloor

    • Roof: colour (light, medium or dark), shape, pitch, ventilation and any reflective sarking.
    • Subfloor: insulation type (none, batt or board), checked from the hatch.
    • No access? Record why in the Additional Information field, with written notes or photos, so the default you applied is explained.

    Equipment

    • Heating and cooling: fixed appliances only. Portable and decommissioned units don't count. Photograph each compliance plate or energy rating label, plus duct outlets and return air grilles, and record which zones a ducted system serves and how old the ducts are.
    • Hot water: type, size, year of manufacture, gas type and efficiency, with photos of every component, on the ground and on the roof.
    • Cooktop and oven: energy source and gas type.
    • Solar and batteries: for solar, the capacity, direction, pitch, inverter size, export limit and age; for a battery, its capacity and chemistry.
    • Pool and spa: area and pump type, with photos.

    Evidence and defaults

    • Evidence that holds up: photos are valid evidence for ceiling and floor insulation. Wall insulation and premium glazing need documents.
    • Photos that pass an audit: recent and legible, tagged to the room, with their metadata and location, tightly framed and free of personal information.
    • Tell the client about defaults. When you use default values, the client must understand that defaults represent the worst case and may lower the home's rating.
    Home Energy Rating evidence rules: a photo is enough for ceiling and floor insulation, while wall insulation and premium glazing need documents.

    Before you submit

    • Every zone has walls, a floor, and a ceiling or roof.
    • Every room is on the plan, with its windows and doors.
    • Every default has been explained to the client.
    • Every room or space you couldn't access has a reason recorded.
    • Every compliance plate and label photo is legible.

    If you can tick all five, you shouldn't need to come back.

    For a data collector, these five checks are the self check before the handover. In the example workflow NatHERS presented in November 2026, the data collector checks that the assessment data is accurate and the evidence is complete, then securely sends the record to the assessor.

    Let the app hold the checklist

    EnBright Collect app screens for a Home Energy Rating assessment: capturing a kitchen room by room, and the Review step listing one thing to fix.
    Example screens: capturing the kitchen room by room (left), and the Review step holding back submit until a window that won't fit its wall is fixed (right).

    EnBright Collect follows the same order as this checklist, from the brief and consent to the exterior, floor plan, rooms, roof and equipment. Over 120 built-in checks run while you capture, most of them drawn from the NatHERS Technical Note. The app applies insulation defaults by building class, state, NCC climate zone and year of construction approval. It flags a window that won't fit its wall, and warns about photos that are blurry, missing a location or not taken on the visit day. It won't submit until every blocking check is fixed or has a recorded reason.*

    Apply for early access to EnBright Collect.


    *Software accreditation is being sought. Our Expression of Interest is lodged with the NatHERS Administrator, subject to its assessment process.

    Sources (read 19 November 2026): NatHERS Technical Note for existing homes (1 July 2026); NatHERS Software Standardisation and Specification Document for existing homes (1 July 2026); NatHERS data collector training and accreditation industry webinar (19 November 2026).

    Cover photo: Sitting room in a house in Corinda, Queensland by Kgbo, CC BY-SA 4.0, via Wikimedia Commons, cropped and annotated by EnBright. This annotated version is shared under the same licence.

    Get early access to EnBright Collect

    Our founding assessor cohort is complete. We're now opening an early-access list while our application for software accreditation is assessed.

    • Priority onboarding when access opens
    • First 2 assessments free at launch
    • First to try new features as they ship, and help steer what we build next
    • A direct line to the product team

    No commitment: we'll email you when access opens.

    Related pages